Power Pylon: Difference between revisions
From Stationeers Community Wiki
More actions
→Notes: Updated text and remove outdated note |
m Fix wrong sheets requirement |
||
| Line 22: | Line 22: | ||
| placed_on_grid = Small Grid | | placed_on_grid = Small Grid | ||
| const_with_tool1 = [[Welding Torch]] | | const_with_tool1 = [[Welding Torch]] | ||
| const_with_item1 = | | const_with_item1 = 2 x [[Steel Sheets]] | ||
| decon_with_tool1 = [[Wrench]] | | decon_with_tool1 = [[Wrench]] | ||
| decon_with_tool2 = [[Angle Grinder]] | | decon_with_tool2 = [[Angle Grinder]] | ||
Revision as of 16:25, 13 August 2026

![]() | |
| Constructing Options | 2 variants |
|---|---|
| Properties | |
| Stacks | Yes (50) |
| Paintable | No |
| Recipes | |
| Electronics Printer | 15g Steel |
| Logic | |
| Item Hash | 824902754 |
| Item Name | ItemKitPowerPylon |
![]() | |
| Handles up to 5kW of power | |
| Operation | |
|---|---|
| Prefab Hash | 980657345 |
| Prefab Name | StructurePowerPylon |
| Construction | |
| Placed with | 2 x Kit (Power Pylon) |
| Placed on | Small Grid |
| Paintable | No |
| Stage 1 | |
| Next Stage Construction | |
| Constructed with tool | Welding Torch |
| Constructed with item | 2 x Steel Sheets |
| Deconstruction | |
| Deconstructed with | Wrench |
| Item received | 2 x Kit (Power Pylon) |
| Stage 2 | |
| Deconstruction | |
| Deconstructed with | Angle Grinder |
![]() | |
| Handles up to 5kW of power | |
| Operation | |
|---|---|
| Prefab Hash | -1234910677 |
| Prefab Name | StructurePowerPylonTerminus |
| Construction | |
| Placed with | Kit (Power Pylon) |
| Placed on | Small Grid |
| Paintable | No |
| Stage 1 | |
| Deconstruction | |
| Deconstructed with | Screwdriver |
| Item received | None |
Description
Cable pylons make it easier to connect power and data over long distances. You can run cables across up to 17 large grids between two pylons, or between a pylon and a terminus.
Each pylon has two isolators supporting two separate cable lines. Each terminus can connect only one cable. After installation use Super Heavy cable to start linking it to an isolator or terminus then link it to another pylon isolator or terminus. For T or X crossing you need to split the pylon segments with terminuses and then cross-connect terminuses.


